Determining the difference between predicted vs. actual lighting use in higher education corridors
Percentage impact of simplifications on total energy use compared to the calibrated model. Furthermore, the ASHRAE calibration criteria are for total energy use, and do not take into account the differences between energy end-uses. Statistical calibration criteria, differences between predicted and measured energy use.
We ask for the pole drawing, including arm length and setback, before we run any photometric calculation. The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. In addition, in certain cases, the profile is normalised to unity (i.e., scaled to bring the values into the range [0,1]).
Either separate schedules can be used for each floor (as shown in Figure 6) or an average for the building can be calculated. Instead, the schedules can take into account uncertainty within the data to understand the effect of variability in the schedules on energy use. A monthly seasonal factor was calculated by taking the average daily maximum number of swipes per month.
All four case study buildings were calibrated within the ASHRAE criteria at a monthly level as shown in Table 2. These limitations are a common issue with model calibration, however, most could be alleviated through rigorous and continuous commissioning, in addition to ensuring that a reliable metering strategy is in place. Spearman correlation coefficients of input parameters on total energy use per building.
Spearman’s rank correlation coefficient (SRCC) was calculated to assess the relationship between the inputs and outputs. Uncertainty analysis is typically accompanied by sensitivity analysis, which apportions the uncertainty of the model output to the input. A higher number of simulations increase the accuracy of the calculated correlations between inputs and outputs from sensitivity analysis. For each building, several thousand simulations were run in order to analyse the variance in predictions. All building spaces were included in the model and zoning of the spaces was identified during walk-throughs of the buildings.
The corridor lighting upgraded was completed in 2014 with microwave sensors, the corridors on the first floor where this study was located have a mixed use of academic offices and centrally bookable classrooms. Equation 1 is extracted from the external consultants calculations used in these corridor lighting upgrade projects and they are based on the Carbon Trust formulae for calculating the business cases for retrofit projects (Carbon Trust, 2012). Two buildings Urban and Maths had upgrades completed by 2013, the financial payback periods for the information cited here the Humanities lighting upgrade was considered unviable and therefore the decision was made that this building’s corridor lighting would not be upgraded at the time. This will allow for evaluation of the accuracy of the energy efficiency calculations commonly used by energy managers for decision making.
Discrepancies between predicted and measured energy use was mitigated through iterative adjustment of building energy model assumptions in four case study buildings. In the case study buildings, the baseloads for equipment in Office 17, 71, CH and MPEB were ~25, 20, 65, 85%, respectively, compared to the NCM assumption of 5.3%. These were a large contributor to a discrepancy between regulatory predictions and measurements as there was a significant difference compared to the typically assumed NCM equipment power baseload.
However, it became clear that a large variation exists in occupancy throughout the seasons as MPEB and CH are university buildings where occupancy is affected by university terms or semesters, evident from Figure 4. As such, for performance modeling during design, it is essential to determine future use of spaces, potentially based on previous experience or data from existing buildings. Schedules of use directly affect energy use and can have a large impact on the discrepancy between predicted and measured energy use. In addition, limitations are described that were likely to affect model calibration accuracy, typically due to a lack of information.